Frier Vest Port Terminal
Frier Vest Port Terminal will open on 1 December 2026 as Port of Grenland’s new container terminal. The terminal is located on the western shore of the Frierfjord in Bamble, close to Grenland’s industrial base and the developing Frier Vest industrial area.
The first phase includes a 180-metre quay, a water depth of 12.5 metres and a terminal area of 65,000 m². With two mobile harbour cranes and an annual handling capacity of 150,000 TEU, the terminal is designed for efficient container handling.
Port of Grenland has built the terminal to provide sufficient port capacity for businesses in the region in the years ahead. Its location, close to established industries and with easy access to the E18 motorway, provides good conditions for efficient transport between production sites, the port and international markets.
Frier Vest Port Terminal is the first phase of a larger port development. The terminal has considerable potential for expansion, with plans to accommodate additional cargo types, including bulk and project cargo.