Terminals

Brevik Terminal

Quays
Tangen quay, Coal terminal: 200m, depth 15m

RoRo terminal
Brevik terminal: 180m, depth 10m. 2 x RoRo-ramps with breadth of 32m.
Railway tracks right down to the quay.
Outside storage: 100.000 sq.m.

LoLo
2 containers of 100 tonnes SWL.

The terminal company, NorthSea Terminal AS, is responsible for Brevik terminal. This terminal is one of Norway’s largest RoRo terminals, and is operated by Scandinavia’s largest shipping lines, DFDS Tor Line, among others. The terminal has direct routes to Great Britain, Belgium, Germany, Sweden and The Netherlands. The terminal has facilities for LoLo, RoRo and dry bulk handling, and is close to the European highway with direct mainline rail access.

See local map.
See the terminal on Google Maps.

Langesund Ferry Terminal

Fjord Line has daily departures to Hirtshals, Stavanger and Bergen. See route information for more details.

Reefer sockets available at Langesund ferry terminal Port of Grenland and Fjord Line are pleased to offer reefer sockets for thermo trailers at the terminal.
The terminal has daily 24 hour availability and is suitable for drivers’ rest periods both before departure and upon arrival. Drivers are requested to contact Fjord Line’s hotline +47 96 64 07 65 upon arrival outside opening hours (open daily 12pm – 14.30).
Idling is not permitted at the terminal and surrounding area after 6pm. We ask that all thermo trailers use the reefer sockets provided when inside the terminal area. The service is free of charge.

For information on Langesund ferry terminal, please visit The Fjordline website.

See the terminal on Google Maps.

Porsgrunn

Quays
Crane quay: 230m, depth 6,7m
Deep water quay: 175m, depth 9.7m
Tinfos quay: 150m, depth 6,7m

Acreage to rent
Storage: 1750 sq.m. on Crane quay

See local map.
See the terminal on Google Maps.

Skien Harbour Terminal

Cargo handling

  • General cargo
  • Dry bulk

Equipment

  • Container trucks 22-30 tonnes
  • Trucks 3 – 8 tonnes
  • Reach stacker 40 tonnes
  • Tug master
  • Wheel loader

Quays
Quay 1: 135m, depth 9.5m
Quay 2: 165m, depth 9.5m
Roro ramp: breadth 30m

Stone quay, Vol: 20m, depth 10m

Acreage to rent
Storage (insulated): 9400 sq.m. + 2450 sq.m.
Outside storage: 90000 sq.m.

See local map.
See the terminal on Google Maps.